Silk Logistics Warehouse

ClientPort of Brisbane
LocationPort of Brisbane, QLD
Delivery Method Design and Construct
COMPLETION DATE2019

PROJECT HIGHLIGHTS

Tomkins delivered the Silk Logistics Warehouse at the Port of Brisbane — the first building constructed on the 230 hectares of newly reclaimed land forming part of the Port’s Future Port Expansion (FPE) project. Built for Port of Brisbane under a Design and Construct contract, with Silk Contract Logistics as the tenant and operator, the 56,650m² development provides a purpose-built distribution and freight-handling facility positioned directly adjacent to Wharves 11 and 12 on the port’s quay line.

The development includes a 15,000m² warehouse, 350m² transport and dispatch office, 20,000m² of heavy-duty container hardstand and 5,000m² of truck parking. The facility’s direct access to the port’s quay line and proximity to Queensland’s major highway network supports Silk Logistics’ operations across the north and south coasts.

Practical Completion was achieved five weeks ahead of the contract date, with the project delivered within the client’s budget.

The Silk Logistics Warehouse was constructed on land that had never previously supported a building. The Port of Brisbane’s Future Port Expansion project has progressively reclaimed land on Fisherman Island since 2007, creating the largest land reclamation project of its kind in the southern hemisphere. Building on reclaimed sand and clay dredged from the mouth of the Brisbane River required Tomkins to lay substantial additional CBR material across the entire site before warehouse construction and external hardstand works could commence.

The 20,000m² heavy-duty external hardstand was engineered to support imposed point loads exceeding 100 tonnes from shipping containers. Tomkins used a Fibre Combi Slab system incorporating two layers of mesh (SL91 top and SL92 bottom) with 35kg/m² of Dramix 3D steel fibre, which allowed the slab thickness to be reduced without compromising structural performance.

Placing over 13,000m² of concrete within the programme required dual shift-working labour crews. Day crews prepared slabs while night crews poured from 3am to avoid the exposed wind conditions at the port and to allow finishing before sunrise, reducing the risk of premature drying and surface cracking.

Roller door design presented a further challenge. To comply with the Fire Engineering Report’s requirement for over 130m² of free air, Tomkins coordinated the roller doors with the Fire Indicator Panel so they would automatically raise during a fire alarm — achieving 100% free air compliance without the perforated roller doors specified in the original design and preventing the ingress of sand and insects from the port environment.

During construction, the Port of Brisbane requested the installation of an additional 300m+ of sewer rising main infrastructure along Curlew Street, outside the original scope. Tomkins managed this variation without impacting programme, delivering the additional sewer works and the project itself three weeks ahead of the revised schedule.

“
Tomkins’ level of professionalism and assistance was outstanding. The team delivered the project ahead of time and under budget, with all additional requirements
Andrew Dennis
Project Manager, Port of Brisbane

The Silk Logistics Warehouse at the Port of Brisbane opened a new precinct on Australia's largest land reclamation project and provided Silk Contract Logistics with a purpose-built, port-adjacent distribution facility. With 15,000m² of warehouse space, 20,000m² of heavy-duty hardstand engineered for container loads and direct access to Wharves 11 and 12, the facility is strategically positioned to support the efficient handling of time-sensitive international cargo. For Port of Brisbane, it marked the first commercial building on the Future Port Expansion land and continued the organisation's long-term partnership with Tomkins.

  • 56,650m² total site area
  • 15,000m² warehouse
  • 350m² transport and dispatch office
  • 20,000m² heavy-duty container hardstand, engineered for 100-tonne loads
  • 5,000m² truck parking
  • Over 13,000m² of concrete poured using dual shift-working crews
  • Fibre Combi Slab with dual mesh layers and Dramix 3D steel fibre
  • First building constructed on 230ha of Future Port Expansion reclaimed land
  • Direct quay line access adjacent to Wharves 11 and 12
  • Substantial CBR material placed across entire site for ground remediation
  • 300m+ of sewer rising main installed as an additional scope variation
  • Roller doors integrated with Fire Indicator Panel for FER compliance

"The first building ever constructed on the Port of Brisbane’s Future Port Expansion land. Delivered five weeks ahead of schedule and within budget.