Komatsu Distribution Centre

ClientKomatsu Marketing Support Australia
LocationWacol, QLD
Delivery Method Design and Construct
COMPLETION DATE2021

PROJECT HIGHLIGHTS

Tomkins delivered the Komatsu Distribution Centre at Wacol, Brisbane, the largest Komatsu distribution centre in Australia and the company’s largest investment in its then 45-year history in the country. Built for Komatsu Marketing Support Australia under a Design and Construct contract, the 23,000sqm facility consolidates Komatsu’s parts and equipment operations into a single site and forms part of a nationwide expansion of the company’s assembly and customer support capacity.

The development brings together a 15,000sqm distribution centre with a fully automated racking and picking system, a 2,500sqm large parts store served by a 30-tonne gantry crane, 3,500sqm of offices, 2,000sqm of awnings and a purpose-built Innovation Hub for showcasing Komatsu’s machinery and technology. The completed facility was handed over five weeks ahead of programme and within budget, ready for the company’s 100th anniversary year.

The greenfield site at Wacol presented a 10-metre fall from its north-west to south-east corner, so a substantial civil and retaining package was needed before the level building pad could be formed. More than 4,000sqm of retaining wall was constructed and around 50,000m3 of earth and rock cut and filled, work that represented over a third of the total project value. Early earthworks also uncovered contaminated fill containing asbestos, tyres, plastic and concrete, which was removed and replaced or recompacted to reach the required compaction.

Four different retaining wall systems were used to manage the level changes across the site, including cantilevered in-situ concrete walls up to six metres high and 220mm tilt panels forming the slab fold between the distribution centre and the large parts store. Detailed temporary works engineering kept these walls stable until the permanent structure was complete.

The distribution centre required super-flat burnished concrete floors to suit Komatsu’s wire-guided automatic forklifts, which operate at height and speed fully loaded. A 300mm cement-treated base was laid under the floor, and pre-pour trials, a concrete technologist, early-morning pours and daily testing held every pour above specification, averaging FF100 and FL85. The adjoining large parts store sits four metres lower and is served by a 30-tonne gantry crane running the 120-metre length of the store, with seven metres of clearance under the hook for moving motors and gearboxes.

The Innovation Hub gives Komatsu a space to display machinery and technology, with an eight-metre ceiling, a six-metre multi-fold glass door for driving equipment inside, a 360-degree visual display and a glazed curtain wall along two elevations. An underpass beneath the machine hardstand links the new facility to Komatsu’s adjacent site, and Komatsu’s own SMARTCONSTRUCTION drone technology supported earthworks survey and site logistics throughout the build.

“
With Tomkins and Komatsu Australia working together with G4 Architects and Siecap Project Team to achieve our goals, the build was completed well ahead of schedule.
Tom Zube
General Manager, Strategic Assets and Projects, Komatsu Australia

The completed facility gives Komatsu a single national distribution hub built to the tolerances its automated warehousing demands, consolidating operations that were previously spread across multiple sites. Handed over five weeks early and within budget, the Distribution Centre and Innovation Hub position the company for growth and gave it a landmark asset to open in its centenary year, while streetscape and network upgrades to Boundary and Progress Roads left a lasting benefit for the surrounding Wacol precinct.

  • Total facility area of 23,000sqm across distribution, storage, office and awning zones.
  • 15,000sqm distribution centre with a fully automated racking and picking system.
  • 2,500sqm large parts store served by a 30-tonne gantry crane over a 120-metre run.
  • 3,500sqm of offices, including a mezzanine level, commercial kitchen and end-of-trip facilities.
  • 800sqm Innovation Hub with an eight-metre ceiling, six-metre multi-fold glass door and 360-degree display.
  • Super-flat burnished floors averaging FF100 and FL85, suited to wire-guided automatic forklifts.
  • More than 4,000sqm of retaining wall using four different wall systems.
  • Around 50,000cbm of cut and fill across a 10-metre site fall.
  • 775 tonnes of structural steel, with a largest steel member of 6.2 tonnes.
  • Underpass linking the new facility to Komatsu's adjacent site.
  • Over 250 car parks across concrete and asphalt pavement.
  • Streetscape and network upgrades to Boundary and Progress Roads.
  • Komatsu SMARTCONSTRUCTION drone technology used for earthworks survey and logistics.
  • Delivered five weeks ahead of programme and within budget.
  • Largest Komatsu distribution centre in Australia.
  • Tomkins' first project delivered for Komatsu.

“The largest Komatsu distribution centre in Australia, delivered five weeks ahead of programme and within budget.”