Build & Design Centre

ClientBrisbane Airport Corporation
LocationSkygate, Brisbane Airport QLD
Delivery Method ECI into Design and Construct
COMPLETION DATEUnder Construction

PROJECT HIGHLIGHTS

Tomkins is delivering the new Build & Design Centre at Brisbane Airport’s Skygate precinct for Brisbane Airport Corporation. Spanning more than 4,000m² across two levels, the purpose-built facility will bring together more than 70 showrooms under one roof, creating a one-stop destination for renovation projects and residential and commercial builds across South East Queensland.

The development marks a major expansion for The Build & Design Centre, which is relocating from South Brisbane to the airport precinct. Secured through an Early Contractor Involvement planning phase, the project continues Tomkins’ long-standing relationship with Brisbane Airport Corporation. Construction is underway, with the Centre expected to open in 2027.

Tomkins was engaged by Brisbane Airport Corporation through an Early Contractor Involvement planning phase, working with the client team and consultants to shape the design, buildability and cost plan before delivery under a two-stage Major Works Contract. The construction programme, following the design lead-in, required key trades including piling, earthworks, concrete supply, structural steel and hydraulic services to be secured early to protect the programme and manage price escalation.

The architecture has designed to create a true design centre visitor experience. A sculptural translucent screening band wraps the upper level, floating above full-height glazing at the entry and curving around the building’s most prominent corners. Feature elements include patterned precast panels, batten screening, feature lighting, polished concrete floors and exposed structure throughout.

Inside, more than 70 showrooms will be arranged across two levels of approximately 2,035m² each, supported by ancillary office accommodation and purpose-built spaces for design seminars and industry workshops. Customer parking at the rear of the site connects to the showroom entrance via a pathway through feature landscaping.

Located off The Boulevard adjacent to DFO Brisbane, the site sits within Brisbane Airport Corporation’s established Skygate retail precinct, with construction coordinated around an active retail environment. The Centre is expected to open in 2027.

When it opens in 2027, the Build & Design Centre will change the way Queenslanders plan and complete building and renovation projects, replacing days of travelling between suppliers with a single destination at Brisbane Airport's Skygate precinct. For Brisbane Airport Corporation, the Centre adds a distinctive retail offering alongside DFO Brisbane and Landers Pocket. For Tomkins, it adds another project to a trusted, long-running partnership within the airport estate.

  • Two-level purpose-built showroom and ancillary office facility.
  • More than 4,000m² of floor area across two 2,035m² levels.
  • Over 70 showrooms brought together under one roof.
  • Purpose-built spaces for design seminars and industry workshops.
  • Sculptural translucent screening band wrapping the upper level.
  • Patterned precast panels, batten screening, polished concrete floors and exposed structure.
  • Customer parking connected to the showroom entrance through feature landscaping.
  • Located in the established Skygate precinct alongside DFO Brisbane.

“More than 70 showrooms under one roof. Queensland's new home for building and renovation.”

Build with us

Kindly fill the below form to Register as a Subcontractor

Kindly fill out the form below to download our Capability Statement.